2022
Since 2022, a complete modernization of the heating systems has been carried out, with new boiler houses equipped with solid-fuel boilers installed. Additionally, a complete modernization of the power supply has been carried out, including the installation of solar power plants with a total capacity of 830 kW, a cogeneration unit of 860 kW, and a range of energy efficiency measures, which have reduced energy consumption by 35%.
A new production section for painting and packaging has been built.